District Districe approved the plan to cover the start of the highway

District Districe approved the plan to cover the start of the highway

Ang Distrito sa Distrito sa Jerusalem ug sa pagtukod sa Komite, nga gipangulohan ni Shira Talm Baray karong semanaha mi-aprubahan sa plano nga tabunan ang pagsugod sa pagsugod sa pagsugod sa pagsugod sa pagsugod sa pagsugod sa pagsugod sa pagsugod sa pagsugod sa pagsugod sa dalan.

The plan, prepared by Kolker Koler Epstein Architect firm, contains 215 Dunams (535 acres) in a narrow strips 1,600 meters long between the Beyt Interchange and the Wolfson Bridge. The place will serve as a “roof” on the highway and provide land for further use. The main build will be built on the edges of the roof, to avoid excessive loading in its center. The roof connects to the neighborhood of the Tomat Hakerem at the Hebrew Givat Ram campus, which is currently separated by busy traffic traffic.

There is a strong construction of the roof above the highway including about 2,000 home units, 250 units of work and 75,000 square feet, and 75,000 square feet for public use for public use. The proposed build variety, and includes structural construction of 6-15 floors, along towers of up to 45 floor.

The planning administration says, “This is the first Israeli project on the roof of a road in such a scale and one of the largest engineering projects in Israel, the fruit is more than a decade of work.” A dedicated administration will be established to carry out the project, as part of the roof of the roof that the municipality of Jerusalem has signed Israel Land Authority.

Published in Globes, Israel News in News – en.globes.co.il – On July 10, 2025.

© Copyright in Globes Publisher Itonut (1983) Ltd., 2025.


Leave a Reply

Your email address will not be published. Required fields are marked *