Dubai to slash travel times on the big road with a new bridge

Dubai to slash travel times on the big road with a new bridge

The new bridge will serve the residential nad al sheba communities and provide direct connection for traffic in Dubai-Al Ain road to Al Ain.

With a plot capacity of 2,600 cars per hour, the bridge reduces travel time from Dubai-Al Ain road to 83 percent, only one.

New bridge in Dubai

The project has enabled smooth and efficient traffic flow for a home area to 30,000 residents, while also facilitates the Nad Al Sheba points.

The construction of the new bridge is scheduled to start the fourth quarter of 2025, which is completed for the fourth quarter of 2026.

The project shows strong RTA reassurance to infrastructure development and development of network capacity on Dubai road.

It tells the rapid growth of the emirate population and urban expansion, especially in residential areas, while facing the highest traffic action patterns and diffusion facilities.

These targets are in accordance with the vision of Leadership in Dubai position as the best city in the world for living and movement.

The construction of the new bridge in Nad Al Sheba, about the strategic RTA direction to achieve safer and more efficient movement.

It requires launching proactive and sustainable road projects and traffic solutions that support the future of mobility in the emirate, reducing travel times for motorists to and from the area, and ultimately contributing to enhancing the quality of life.

These projects reflect RTA commitment to know the vision of delivering a flexible and integrated infrastructure that keeps the rapid growth in emirate city.

They also emphasize continued efforts of authority to achieve seamless and lasting movement.

In parallel, RTA Remained to listen to Public Feedback and included input to residents in future development plans, which reflect a cultural collaboration and active community engagement.

Collectively, these projects support RTA’s strategic objectives of enhancing the efficiency of the road network, improving traffic safety, and strengthening Dubai’s global leadership in Smooth and Sustainable Mobility.

The RTA has been driving a major bridge at Nad Al Sheba Street intersection and Dubai-Al Ain Road. Sayning 170m and has two paths in each direction, the bridge is facilitated by traffic flow from Dubai-Al Ain Road to Nad Al Sheba, Meydan, and adjacent development projects.

As part of the most project, the RTA also produces comprehensive traffic improvements around many schools, including Repton School School and Al Khaleej International School, which has served at approximately 10,000 students.

These improvements include adding parking spaces and designated pick-ups and drop-off places, carrying out smooth traffic flow and road safety in hours of healing hours.

As part of Nad Al Sheba’s developments, an intersection in the Junction of Lomifa Bint Hamdan Street and Nad Al Sheba to flow in time to delay.

RTA also establishes new entry points from Meydan Street to residence area, contributed to a 60 percent reduced travel time and visitors.

To support the internal infrastructure in place, the RTA also provides an integrated road network, including internal roads and additional points of access to Nad al SHEBA 1, 3, and 4.

These improvements have set the connection between neighborhoods and extend the ability to the local road network.

Leave a Reply

Your email address will not be published. Required fields are marked *